You are here

Timeline

Primary tabs

This used to be a SVN Timeline, which can now be accessed at:

https://openmx.ssri.psu.edu/commitlog

The proposed OpenMx software development timeline is shown graphically in the chart below. The major milestones are (as of 8/4/09):

First working prototype grid node in R (completed)
First working prototype test (completed)
First draft of prototype R and Grid Nodes (90% completed)
Begin production coding of R functions and Grid Nodes (85% completed)
First OpenMx script parsed and executed (completed)
Begin User Interface modules (0% completed)
User Interface prototype complete (0% completed)
Begin User Interface production coding (scheduled for 7/09)
First Open Beta test (scheduled for 10/09)

AttachmentSize
Image icon OpenMx0908a.jpg147.65 KB